
We provide a full range of oil and gas well completion services.
Completion is the work that turns a drilled hole into a producing well: the pay zone is connected to the wellbore while every other horizon is isolated. The choices made at this stage govern the well's flow rate and its workover frequency for the whole of its producing life.
The scope covers running and cementing the production casing, perforating, setting packers and tubing, and installing the wellhead and Christmas tree. The architecture follows the reservoir — open hole or cased hole, single or multi-zone, with sand control where the formation calls for it.
Where reservoir pressure is not enough to sustain natural flow, an artificial lift method is designed: sucker-rod pump, electric submersible pump or gas lift. The choice follows the well profile, the expected rate, gas-oil ratio and fluid properties.
EWD takes on the completion design, equipment supply, technical supervision of the field operations, and documented handover of the well to the client.

